Planroom Options

Bidroom Homepage

Public Jobs
Private Projects
Calendar

Log In
Version 6.0.9.1

 
 
   Information  
 
 
   Plan Holders  
 
 
   View Plans  
 
 
   Addenda  
 
 
   Spec Sheets  
 
COMING SOON Shenandoah Valley Regional Airport - Replace Airfield Lighting System (20048)

The project includes the rehabilitation of the Airport’s taxiway and runway lighting, REILS, and PAPIs with new LED fixtures, along with new transformers and cable. This project also includes rehabilitation of the existing airfield electrical vault by replacing all existing Constant Current Regulators (CCRs) and the installation of a new supplemental windcone.

The scope of the project includes the following:
*Replacement of taxiway and runway light fixtures with new LED fixtures
*Replacement of airfield lighting cable
*New supplemental windcone
*Two new 4-box LED PAPI systems
*Replacement of the airfield emergency back-up generator
*Replacement of runway 23 REILs with LED fixtures
*Replacement of regulators inside the electrical vault
             
  
Sorted By Company
Click on the following links to sort by a category
Company | CSI Codes | Contact Name  | Date | Bid Category
Loading...    Refreshing . . .
Printer Friendly Version



  Plan Holder List for ' COMING SOON Shenandoah Valley Regional Airport - Replace Airfield Lighting System (20048)'
  Company Information    CSI Codes  Contact Information  Status
Date Filled
Date Returned  
Delivery Method  
Tracking Number