Planroom Options

Bidroom Homepage

Public Jobs
Private Projects
Calendar

Log In
Version 6.0.11.11

 
 
   Information  
 
 
   Plan Holders  
 
 
   View Plans  
 
 
   Addenda  
 
 
   Spec Sheets  
 
COMING SOON Gallipolis, OH - Schedule 2 - Building Demolition, Utility Construction, Site Preparation (23047)

This project is for the replacement of the existing General Aviation Airport Terminal Building. The new building will be constructed in the same location as the existing General Aviation Airport Terminal Building. This project will demolish the existing building and construct utilities such as natural gas, municipal water, sanitary sewer, power, and telecommunication utilities to defined locations approximately 10-feet outside the proposed new terminal building. This project will also include site preparation, grading, and drainage for the new building.
             
  
Sorted By Company
Click on the following links to sort by a category
Company | CSI Codes | Contact Name  | Date | Bid Category
Loading...    Refreshing . . .
Printer Friendly Version



  Plan Holder List for ' COMING SOON Gallipolis, OH - Schedule 2 - Building Demolition, Utility Construction, Site Preparation (23047)'
  Company Information    CSI Codes  Contact Information  Status
Date Filled
Date Returned  
Delivery Method  
Tracking Number