REBID-Ada, OK - Rehabilitate Runway 18-36 (22059)

The proposed project includes the variable depth mill and nominal overlay of the primary runway (Runway 18-36). The project also includes grading improvements within the runway safety area (RSA) grading off the two runway ends. An edge drain-system is proposed along the length of the runway. Minor electrical work includes the replacement of a threshold lighting pad and associated electrical equipment.
You need to register or login to view files and more project information.

For information regarding this project please contact:

Steven Hart

Delta Airport Consultants

405-605-4992

shart@deltaairport.com

Bids must be accompanied by a certified check or a bid bond in the amount of not less than five (5) percent of the total amount bid. A Contract Performance Bond and a Contract Payment Bond each equal to 100 percent of the Contract Price will be required for the successful Contractor.

No bid may be withdrawn prior to October 15, 2024.